top of page

Pre-Construction Research Report (PCRR)

Pre-construction is a critical phase that establishes the foundation for successful vertical construction projects, focusing on comprehensive horizontal planning and preparation. This phase includes identifying soft costs—expenses essential for project readiness but not part of the actual construction process. These costs encompass fees for vital design services like MEP (Mechanical, Electrical, Plumbing) Design, Foundation Design, and various reports and surveys, including Topographic Surveys, Geotechnical Reports, and Soil Analysis Reports. Bedrock Building Group’s Pre-Construction Research Report (PCRR) provides an in-depth overview of these soft costs, outlining the scope and requirements and including their estimated pricing within the report. This ensures you have the necessary information to plan effectively, helping to ensure your estimated soft costs align with your overall project budget for a well-organized and cost-efficient project from the outset.

Start
Step 1

Find the design that best suits your needs

Calender

Selections of Style:

  • Traditional

  • Modern

  • Mediterranean

  • Single Story

  • Two Story

Selections of Sizes:

  • Studio + 1 Bath

  • 1 Bedroom + 1 Bath

  • 2 Bedroom + 2 Bath

  • 3 Bedroom + 2 Bath

  • 1 Bedroom + 1 Bath + Garage

  • Small Spaces

Selections of Orientation:

  • Narrow lot width

  • Wide lot width

  • Single Story

  • Two Story

  • L-Shape (coming soon)

Step 2

Fill out the contact form to book a call

Step 3

We will schedule a virtual meeting so that we can share our screen and discuss the most economical route to your dream home

Phone operator
Signing contract
Step 4

The contract is signed, deposit is paid, and the PCRR begins!

Step 5

Week 1

Identifying the Property

​

Verifying the APN Number

​

Exploring Monument Placement (if possible)

​

Conducting Topography Software Research

​

Identifying Additional Building Locations on the Property

Tract of land
Construction Coordinator
Step 6

Week 2

Setback Determination

​

Site Height Constraints

​

Footprint Allocation

​

Utility Mapping and Availability

​

Panel Upgrade Picture Verification

Week 3

Research to find costs for local Architect and Engineering Services

​​​

Mechanical, Electrical, and Plumbing Guidelines Foundation Standards

​​​

Fire Sprinkler System Specifications

​​

Solar Research​

​

Regulations Topography Guidelines​

​​​

Survey Protocol

​

Soil Report Specifications

​

Assessment of Plan Check and Permit Fees

​

Identifying Additional Building Locations on the Property

Building Permits
Step 7
Charts
Step 8

Week 4

Reverification of Information from Weeks 1-3

​

Clearing and Grading Criteria

​

Electrical Connection and

Trenching Guidelines Sewer or Septic Trenching Protocols

​

Water Meter or Well & Trenching Specifications

​

Identification of PCRR Supervision Fees Distinction Between Contract or Pricing & Pass-Through Costs

​​​​​​

Research to find costs for local General Contractor and Subcontractor Services

Research Complete

A virtual meeting is scheduled and we share our findings with you.

Limited reservations available!

Did you know? Many ADU builders run into parking issues. Bedrock Building Group offers models that incorporate parking!
bottom of page